Debugging of beer equipment

Depuración de equipos de cerveza

In recent years, with the continuous upgrading and maturity of beer consumption structure and production technology, my country’s beer industry has entered a new cycle of development. High value-added products represented by craft beer have become the targets of industry overweight. Compared with traditional industrial beer, craft beer has more varieties and is favored by emerging consumers in society. In the era of craft beer, the selection of brewing equipment is particularly important. How to choose the beer brewing equipment that suits you? After the introduction of equipment, how to make the brewing system run ? Micet will discuss and learn with you about the knowledge of beer brewing, beer equipment installation and maintenance.
Table Of Contents

Determine Brewery Location

Positioning beer equipment According to the brewing process requirements and site conditions, refer to the layout plan to determine the location of the beer equipment.

Determine the operating direction of the brewhouse equipment

Determine the orientation of the operating surface of the brewhouse equipment, and try to face the audience. Adjust tank spacing, connect process piping, fittings and wort pumps. Install an exhaust tube and install a ventilation device in the operating room to ensure that the indoor gas (steam) is discharged in time. Fill the brewhouse and filtration equipment and pipelines with tap water, turn on the electricity (steam) for heating, start the wort pump, test for leaks, exhaust steam, and check all parts, and then start feeding after there is no abnormality.
20bbl craft brewing equipment

Install the fermenter

After installing the L-shaped pipe, valve, pressure gauge, and accessories of the fermenter, pressurize it with tap water to 0.18-0.2mpa and keep the pressure for 2 hours. It can be cleaned only after there is no abnormality (it can be put into the test only if there is no pressure relief phenomenon), and it should be tested one by one.

Install refrigeration equipment

The installer connects the condenser of the refrigeration equipment with the evaporator in the ice water tank on-site, and conducts a pressure-holding test according to the installation process requirements of the refrigerator. It can evacuate (it is forbidden to use this machine to evacuate), charge refrigerant, start the compressor, and adjust the pressure of the refrigerant.

Feeding

Under the guidance of the brewer and combined with the process requirements, connect the ice water pipeline and the material pipeline (including the heat exchanger). After the connection is completed, conduct a tap water leak test, cut the leak point, and prepare for trial feeding.

Debug electrical components

Fix the position of the distribution box and instrument box, connect all load lines and signal lines according to the circuit diagram, check and debug one by one, and then turn on the power supply.
Emphasis: The refrigerator needs to be installed by professionals, and the wort pump cannot be run without load or in reverse.

Debugging points of auxiliary equipment and accessories

The pulverizer should be installed in the dust-proof room. After checking that the grinding disc is normal, the machine can be powered on for trial operation. Also, test the machine according to the commissioning requirements of the wort pump.

Debugging of Yeast Expansion Equipment

After installing the ultraviolet lamp in the indoor aseptic inoculation box, turn on the power supply of the mold incubator and the strain refrigerator, adjust the temperature, and prepare sterilization tanks, glass instruments, and other equipment according to the requirements of the cultivation process, and wait for the cultivation.

Fermentation equipment

After the fermentation equipment is installed with pipelines, valves, air pressure gauges, temperature sensors, and other accessories, it should be pressurized and maintained with tap water for 2 hours. If there is no abnormality, it can be washed and tested one by one.

Feeding

Under the guidance of the brewer and combined with the process requirements, connect the ice water pipeline and the material pipeline (including the heat exchanger). After the connection is completed, conduct a tap water leak test, cut the leak point, and prepare for trial feeding.
Note: During the commissioning and installation process of craft beer equipment, non-staff personnel cannot open and touch it at will, so as not to affect next use.
In the context of consumption upgrades, major beer brands have accelerated their entry into the craft beer truck, and craft beer is already on the cusp of growth. Craft beer enthusiasts and investors are grasping the opportunity to catch the ride of craft beer, which has become a great wisdom move!
10bbl conical fermenter
Tanque de fermentación

China stainless steel fermentation vessels manufacturer The fermentation tank is where the beer carry out the fermentation process, it provides a place suitable for life

Read More »
10bbl conical fermenter
Tanque de fermentación

China stainless steel fermentation vessels manufacturer The fermentation tank is where the beer carry out the fermentation process, it provides a place suitable for life

Read More »
Get a turnkey solution for brewery equipment
If you plan to open or expand the brewery, you can contact Micet Craft directly. Our engineers will design and manufacture brewery equipment according to your brewing process. Of course, we will also provide you with a complete turnkey solution. Also, if you plan to expand the brewery, we will provide you with customized solutions.

Deja un comentario

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

Contact Micet Craft

We will contact you within 1 working day, please pay attention to the email with the suffix “@micetbrewing.com”. 

Póngase en contacto con Micet Craft

Nos pondremos en contacto con usted en el plazo de 1 día laborable, por favor, preste atención al correo electrónico con el sufijo “@micetbrewing.com”.

Wait! .......

Ready to start your brewery business?

We’re the experts in beer brewing equipment, offering tailored solutions for your needs. Whether you’re opening a new brewery or upgrading existing equipment, we’ve got you covered.

Here’s what you’ll get when you choose us:

  1. Custom Solutions

    :

    Our team of engineers will design equipment to fit your exact specifications, ensuring it’s a perfect match for your business.

  2. Special Offer

    :

    As a thank you for choosing us, we’re offering exclusive deals for new customers. Contact us now to learn more!

  3. Expert Advice

    :

    With over 16 years of industry experience, we’ll provide you with professional guidance to help you launch or expand your brewery business smoothly.

Note: Your email information will be kept strictly confidential.